Andorra – Sur 15

Urban planning

Andorra – Sur 15

Urban planning
  • Year: 2013
  • Location: Unidad de actuacion PP-SUR- 15 Mestre Xavier Plana, Andorra la Vella

This amendment modifies how the internal roadways are defined for the PP- SUR-15 “Mestre Xavier Plana” unit so that, technically, what was proposed by the POUP (Urban Zoning Plan) can be completed, even though it could not be built as it did not meet the Urban Development Regulation parameters given the unit’s actual topography. It also defines the location of the mandatory and gratuitous unit to be given that was not completely defined for the approved POUP and it relocates the part with a building zone classification by Z-6 volumetric definition.

  • Architecture:

    5%
  • Urban planning:

    75%
  • Engineering:

    10%
  • Legal:

    10%
Return

Este sitio web utiliza Cookies propias y de terceros para recopilar información con la finalidad de mejorar nuestros servicios, y cookies de analisis para analizar sus hábitos de navegación. Si continua navegando, supone la aceptación de la instalación de las mismas. El usuario tiene la posibilidad de configurar su navegador pudiendo, si así lo desea, impedir que sean instaladas en su disco duro, aunque deberá tener en cuenta que dicha acción podrá ocasionar dificultades de navegación de la página web. Cómo configurar cookies

ACEPTAR
Aviso de cookies