Vielha – Pas Arró

Engineering

Vielha – Pas Arró

Engineering
  • Year: 2012
  • Location: Pas d'Arró

The infrastructure project aims to define and assess different actions to improve Avda Castièro and part of Avda Pas d’Arró, according to the four points set out by Vielha Town Council. The improvement has been divided into three phases:
– Phase 1: Reconditioning all Avda Castièro and one section of Avda Pas d’Arró. The total length of this improvement is 257 metres.
– Phase 2: New land development for the whole church square.
– Phase 3: Reconditioning Avda Pas d’Arras for the whole section required to reach the end of it.

  • Urban planning:

    10%
  • Engineering:

    85%
  • Legal:

    5%
Return

Este sitio web utiliza cookies para mejorar la experiencia de usuario. Si continúa navegando está aceptando el uso de dichas cookies y la aceptación de nuestra política de cookies

ACEPTAR
Aviso de cookies