Gelida – Pont

Engineering

Gelida – Pont

Engineering
  • Year: 2016
  • Location: Gelida

The project should enlarge the bridge over the River Anoia on the BV-2249 (PK 2 + 220, TM in Gelida) and thereby provide a solution for the road’s load restriction at this point where, with a roadway only 3.80 metres wide, the traffic must be restricted to a single lane with the use of traffic lights.

  • Engineering:

    95%
  • Legal:

    5%
Return